Installation Video
Dimensions
2 Burner Dimensions
4 Burner Dimensions
5 Burner Dimensions
Electricity
The two burner unit will be able to be plugged into a standard Israeli outlet.
The four burner unit will be plugged into a 3-phase electrical outlet size 16A. The unit will be delivered with the 3 phase electrical plug (5x16A) attached to it.
The 5 burner unit will need to be directly connected by a certified electrician as per the below diagram.
Access
The 5 Burner Unit will be plugged into a 3-phase electrical outlet size 32A.
The unit will be delivered with the 3 phase electrical plug attached to it.
Controller
The controllers should be installed as a 'drawer within a drawer'.
The kitchen should be designed with a drawer within a drawer to contain the controller.
It is important to leave access for the wires to connect to the side of the controller units.